News 24 Dec 2022

New powerhouse in Nilandhoo after 22 years

President Ibrahim Mohamed Solih inaugurated North Huvadhu Atoll Nilandhoo New Powerhouse and office building on Saturday, 24th December 2022.

At a ceremony held at the island, His Excellency President Ibrahim Mohamed Solih shut down the 22-year-old powerhouse in the island, with the establishment of new Powerhouse.

The new powerhouse is situated away from the main settlement of the island, and measures 179 square meters in area.

With a maximum load of 249 KW recorded this year in Nilandhoo, the new powerhouse has been designed with a capacity of 1.2 MW to install three, 400 kilowatts class generators.

The administrative block within the premises measure 158.2 square meters, with the capacity to accommodate a maximum of 30 employees.

These New powerhouses built across islands under Fenaka will have state-of-the-art office buildings and an upgraded fuel storage network.


©2024 Fenaka Corporation Limited. All rights reserved