Noonu Atoll, North
Fenaka provides electricity, water and sewerage services to Validhoo. The diesel dependent electricity generation in the island has now been transformed into a solar and diesel hybrid power generation system. In addition, the island has a reverse osmosis plant providing desalinated water to households. Furthermore the company also operates and provides maintenance to the gravity sewerage system established in the island.
Installed Capacity
1,758 kW
Number of Gensets
5
Peak Load
801 kW
Size of Solar PV installed
172 kWp
Monthly average usage
267170.34 kWh
Electricity Connections
660
Sewerage Connections
239
©2025 Fenaka Corporation Limited. All rights reserved